
CRH Africa (Korsten Plant) - HaldanMES
CRH Africa was able to increase their Overall Equipment Effectiveness (OEE) on a press machine, which uses progressive technology tools, by 9% in just 12 months. This was achieved by using principles of Overall Equipment Effectiveness and Lean Tools.

Ebor Automotive Systems - Haldan Consulting
Haldan Consulting assisted with a process optimization project for tool changeovers at Ebor Automotive Systems. The aim was to provide an efficient method for optimizing the tool change process to reduce the amount of downtime currently being experienced during tool changeovers.

Foxtec-Ikhwezi - HaldanMES
HaldanMES has assisted Foxtec-Ikhwezi, in East London in improving a number of difficulties they were experiencing on their shop floor, including reducing tool change over times.

Lumotech - HaldanMES
Lumotech has recently extended its OEE project with HaldanMES being used to monitor over 80 machines in their Uitenhage facility. Their continuous improvement program has drastically reduced their most prominent downtimes.